History for Minutes 19 June 2006
changed:
-
Present: Shane, Karl, Travis, Poul.
An "audio recording":ftp://ftp.bioeng.auckland.ac.nz:/cmiss/opencmiss/meeting-2006-06-19.ogg is available.
MPI Test problem proposal and implementation
* Karl updated the suggested test problem:
* made the time step implicit as a linear solve is required for the
non-diagonal mass-matrix anyway.
* changed the solution to make boundary conditions homogeneous.
* No feedback, so will go ahead with this problem.
* libmesh has example that is very close to what we want.
* Easy to change solver, preconditioner, tolerance, and probably
maxiterations.
* One thing we would want to change is that matrix assembly is done at each
time step.
* Another thing is the penalty method as discussed on [OpenCMISS/libMesh Development Notes].
* Travis is happy with the method.
* Karl is not.
* but can get something going fairly quickly and improve after we have a
base to improve on.
* Need to set up cm examples as well.
* cm has time-dependent heat equation.
* Could also possibly use "grid-based fem" monodomain model with a cell
model that does nothing.
Libmesh and visualization
* Shane investigated visualization for libmesh.
* Where is solution information collated before writing out the
solution?
* cmgui currently knows when a (some component of) field has
changed and can automatically update aspects that depend on
this.
* Integrating with libmesh might require an explicit function to
update graphics from libmesh data. e.g. create isosurface from
mesh and solution.
* GMV is a gui (executable only) available to display libmesh output.
eclipse
* provides a debugger that has MPI support.
cmiss.org development
* job description for new position may be moving away from web
development as Gareth may be looking after web stuff.
* Gareth (logged in as stevens) fixed the long-standing "Missing emails for
this tracker" bug which meant no notification of new bugs.
Decisions:
* Shane: want to make a decision on a framework ASAP (last February).
* Shane away next week but keen to set up some criteria to make decisions on
framework.
* Criteria
* execution speed
* language
* time to develop
* user community for support
* flexibility
SUR cluster
* meant to arrive in NZ on 30 June.
Microphone
* We should buy a microphone for the meeting room.